MRM Consulting Services
Independent technical and economic advisory spanning commercial fleet performance, greenfield airport feasibility, and sovereign infrastructure governance. Grounded in thirty years of aircraft telemetry, OAG route modelling, and geotechnical risk engineering.
Matecaña (SKPE) Operational Limits & The Greenfield Aerotropolis Transition
Authored by MRM Principal Marlon Mejía Rojas (2021 Master Prefeasibility Study & November 2025 Comité Intergremial de Risaralda Risk Briefing), our technical dossier established that SKPE’s urban plateau (1,346m MSL, ISA+15, 1.2% slope, 2,040m TORA / 1,919m LDA) severely penalises NextGen narrowbodies: an unpenalised A320neo (73.5t MTOW) requires 2,365m TOFL, while an A321neo even at 85t RTOW demands 2,560m.
Crucially, our November 2025 briefing formally documented the unmonitored north-slope geological fault lines (La Romelia–El Pollo / Gilberto Peláez), Formación Barroso aquifer seepage, and 12 critical hydro-sanitary collector collapses beneath the runway—demonstrating why multi-trillion-peso ridge extensions yield negative IRR compared to a permanent Greenfield Aerotropolis at Haciendas Santa Rita & San Felipe serving the 5-million-habitant catchment.